308650 Stand Off Frame
Vaillant 308650 Stand Off Frame
Frame allows vertical plumbing pipework to run behind a Vaillant Ecotec boiler.
The frame allows distance to be added between the boiler and the wall of approximately 65 mm to allow for more flexibility with pipework.
Helps to achieve a much neater boiler installation and to install boiler in areas of limited space.
The steel frame provides a strong frame which can reliably hold larger boilers in place.
Features:
- Steel frame
- Durable
- Hides pipework behind the boiler
- Installation where space is limited
New
Box may be tatty from storage






